Short answer: Cars stopped running one wire per function decades ago and moved to a shared digital network. Not because the market demanded it, but because it was the ONLY way to cost effectively achieve the required outcomes, ON budget, quicker.
Building evolution is at the same point.
The technology is proven, so what’s holding the industry back is mostly understanding, not engineering.
Velbus is built on that same proven technology, using the SAME chips, creating cost effective buildings, not just “Smart Buildings” or “Smart Homes”.
All buildings become better equipped and easily adapted to evolving needs.
What happened in cars?
Three decades ago every function in a car had its own wire:
- window switch to window motor,
- light switch to bulb,
- sensor to gauge.
Add enough electronics and you end up with a wiring harness that’s heavy, expensive and a nightmare to install and fault-find.
Bosch started work on a fix in 1983 and introduced CAN, the Controller Area Network, at an engineering conference in Detroit in 1986.
Instead of a wire for every function, the parts share one network and each one listens for the messages meant for it. The first production car to use it was the 1991 Mercedes-Benz S-Class, and it became an international standard (ISO 11898) in 1993. (CAN in Automation history, Wikipedia)
Today every new car, train, tram, ship and aircraft, uses CAN networks.
Nobody had to turn every mechanic into an electronics engineer first.
The architecture got better, the tools followed, and the trade adapted.
The same technology is in Velbus
Velbus is built on that same family of technology: a shared digital bus with intelligent modules on it, each doing its job. A button isn’t wired to a light any more. It sends a message, and what happens next is a setting.
That means you can change what a button, sensor or output does without opening a wall.
And it’s not just for smart homes. It’s a digital wiring solution for ALL building and vessels, so this applies on commercial, industrial, marine and domestic jobs alike.
One thing doesn’t change: the loads still need properly designed power circuits, protective devices and a compliant installation. In many ways making them safer and easier to service as the local leg of the power supply is managed independently.
The ELV (15Vdc) bus carries the control messages. It doesn’t replace the final load power wiring.
Why hasn’t the building industry moved?
In my experience it’s rarely a technical problem. Each trade works with what it knows and can stand behind:
- Architects and designers specify what they know and can document with confidence.
- Electrical designers are accustomed to conventional circuit design and have limited digital-control experience.
- Electricians worry about programming, support and taking responsibility for methods they haven’t used.
- Plumbers and heating installers often see controls as someone else’s job or something that only they can be responsible for.
- House builders and developers worry about cost, risk, programme delays and aftercare.
Meanwhile the person living or working in the building experiences one building, not five trades.
The idea that digital means expensive and complicated is the one to challenge.
The fundamentals of electrical installation stay exactly where they are.
You add one new skill: configuring intelligent devices and their functions.
The honest part
I’m not going to tell you digital always uses less copper or costs less, because it doesn’t. It depends on the job: the layout, the specification, the labour rates, the equipment. I made a similar point in my post on Cat6 and Cat5e.
What digital can give you is more functionality and the ability to change your mind later. Whether that’s worth it is something to work out on the job in front of you, with like-for-like comparisons and real installation data.
What people often do is compare prices without comparing like for like.
They start thinking that “anything is possible” and design in the features they want, on day one.
Which instantly puts the Digital Cost way ahead of the Classic alternative.
If the Digital Design stuck firmly to the bare minimum that a classic system can deliver, then the costs can be comparable.
Try this animation to see how a directly comparable (in operational features) design can work between a Classic Install and a Digital one.
Race to completion: classic vs digital
Start basic, upgrade later as a customer choice
Once you add features to a digital design, the cost obviously goes up.
What you can do is install a very basic system to meet the budget targets, then offer upgrades to buyers, either at the point of sale or months or years later, when they have the money or the desire to change.
The digital bus is the backbone, and upgrades rarely touch it. Changes happen at the cabinets or the glass panels (Switch control locations). Adding something like a window blind just needs power and access to the bus.
Ultimately, we all need to sell our products, whether that’s a finished building or a component.
A digital solution means you can sell what the customer can afford today and leave the sales window open for years to come, so the customer CAN have the features they want, WHEN they can afford them. That makes for a much softer sales relationship, where they are more likely to come back to you with their extra budget.
What any customer wants is real choice and the ability to take ownership of a building that suits both their needs and their budget.
Giving them that is a powerful sell.
The minimum you need to know
We don’t need every electrician to become a building automation specialist.
We need them to understand digital building infrastructure.
We don’t need every architect to become a programmer.
We need them to know what becomes possible when the wiring no longer dictates the design.
To address this knowledge gap, I host a “what’s the minimum you need to know” session, in two parts:
- The 90-minute overview. The headlines and the principles. For an architect or designer, that may be all you need.
- A further 90 minutes in the room, if someone wants to go deeper.
An installer will want to see it working and prove to themselves that they CAN do it (pun intended).
The full three hours is roughly an hour of theory and two hours of practical, split at the 90-minute mark.
The cost for 2026/27 is £100 per person, whether you stay for 90 minutes or the full three hours. If you go on to place an order, that £100 comes off the total of your order.
- Low risk
- Low investment
- High worth
- No lock-in.
It isn’t free, on purpose. A paid session holds us to account for it being worth your time.
Locations: Dates and places to be confirmed. Click to send an email for more information
For those who want the full training, it’s £2,000 for an 18-hour session with a working demo case, and that cost is also credited back over subsequent orders.
Don’t take my word for it
The best way to judge any system is to put your hands on the hardware before you commit your money, your time and your methods, but most importantly your professional reputation.
Test it for yourself, and don’t proceed purely on someone else’s say-so, unless they can evidence their own experience and knowledge.
That’s what the further 90 minutes are for, to prove to yourself that it’s completely within your skillset.
I’ve trained over 3,000 UK students and installers in the five years to June 2026.
In the UK we don’t have a fixed training building, instead we rent spaces wherever groups ask for training or utilise your own training spaces.
Our head office in Belgium has a demo room and training area that anyone is welcome to visit. Come and see it working for yourself.
FAQ
Why compare buildings to cars?
Because cars went through the same change.
Every function used to have its own wire, and a shared digital network made increasingly complex vehicles practical to build, diagnose and maintain.
Buildings are heading the same way, hitting the SAME bottleneck where the need for better functions are limited by the wiring techniques in use.
Is Velbus just for smart homes?
Not specifically. It’s a digital wiring solution for ALL wiring: commercial, industrial, marine and domestic.
Does digital wiring replace the power wiring?
No. The final loads still need properly designed power circuits and protective devices. The ELV bus carries the control messages, the things that control the building, rather than just the electrons.
Does it always cost less?
No, it depends on the job, so always compare like for like. See “Start basic, upgrade later” above.
Can I start with a basic system and upgrade later?
Yes. Install what meets the budget today and add features later, at the point of sale or years on, as the customer’s budget or wishes change.
How much is the overview session in 2026/27?
£100 per person, whether you stay for 90 minutes or the full three hours, and it comes back off an order if you go on to buy.
Coming next
This post is the overview. Later posts look at what it means for electricians, architects, developers, and plumbers and heating installers.
100% true!
Thanks.
We’re very happy that your approve.